2019 Direct Block Simulation of a Complex Gold Deposit Stochastic orebody modelling of complex mineral deposit. 2020 Risk Analysis of Conventional Long-term Schedule The project aims to measure the impact of equipment uncertainty on the long-term schedule through risk analysis. Stochastic Long-term Schedule with Equipment Uncertainty The project aims to include and measure the effects of equipment uncertainty in the stochastic long-term schedule.